What this calculator does
This calculator converts the required good packs per day into a required operating rate after available hours, planned lost time and expected line efficiency are applied. Use it to create a realistic capacity requirement before comparing machine speeds.
Use good output as the target
Enter the number of acceptable finished packs required, not total machine cycles. Include the expected product mix where formats run at different rates.
- Use daily or shift demand consistently
- Add growth as a separate scenario
- Avoid averaging incompatible pack formats
Remove planned lost time
Changeovers, cleaning, breaks and planned checks reduce the minutes available for production. Enter the expected total for the period.
- Use observed changeover times
- Include required hygiene and line-clearance time
- Model peak and normal schedules separately
Apply realistic efficiency
Efficiency allows for micro-stops, reduced speed and quality loss. Use measured current data or a documented assumption and test sensitivity.
- Do not assume 100% efficiency
- Check the rate of the slowest line station
- Add accumulation and recovery analysis