Packaging line integration and controls
Connect machinery, conveyors and production data using controlled buffers, PackML, OPC UA and defined recovery behaviour.
4 practical guides · 3 calculators · Updated 1 September 2026

Where to start
Integration covers physical product flow, rates, states, handshakes, rejects, safety and information. A common interface helps only when ownership and failure behaviour are also defined.
Use the guide that matches your decision
Each guide begins with a direct answer, then lists the information to collect, the decision sequence and common mistakes.

How to size conveyor accumulation
Estimate conveyor accumulation from upstream and downstream rates, expected stop duration, product stability and restart behaviour.
Open customer guide →
PackML for packaging machinery
Use PackML states, modes and tags to create consistent machine behaviour and clearer packaging-line integration.
Open customer guide →
OPC UA for packaging lines
Plan secure, structured production-data exchange between packaging machines, line control, SCADA, MES and analytics systems.
Open customer guide →
Root-cause analysis for packaging line stoppages
Find the initiating cause of recurring packaging-line stops instead of repeatedly resetting the final alarm.
Open customer guide →Free production tools
Use the results as planning estimates and retain the assumptions used.

Conveyor accumulation calculator
Estimate buffer units, conveyor length and recovery time from line rates, stop duration, product pitch and capacity margin.
Open free calculator →
Production bottleneck calculator
Compare the effective rates of up to four packaging line stations and identify the current capacity constraint.
Open free calculator →
Takt time and production capacity calculator
Calculate demand takt, required operating rate and effective production capacity from available time and expected efficiency.
Open free calculator →Useful questions before the next step
Does matching conveyor height integrate a line?
What does PackML add?
What does OPC UA add?
When is accumulation useful?